사석마운드 설치에 따른 조력발전용 수문의 통수성능 변화

Title
사석마운드 설치에 따른 조력발전용 수문의 통수성능 변화
Alternative Title
Change of Water Discharge Capability of Sluice Caisson for Tidal Power Plant According to Installation of Rubble Mound
Author(s)
이달수; 오상호; 이진학; 박우선; 조휴상; 김덕구
KIOST Author(s)
Yi, Jin-Hak(이진학)Park, Woo Sun(박우선)
Alternative Author(s)
이달수; 오상호; 이진학; 박우선
Publication Year
2008-05-22
Abstract
In this study, the results of experimental investigation on the water discharge capability of sluice caisson for tidal power plant were presented. In particular, the focus of the study was placed on the examination of change in water discharge capability of a sluice caisson according to the installation of rubble mound. For this purpose, a hydraulic experiment was carried out in an open channel flume with a great care to the measurement of discharge and water level in the flume since they greatly affects the estimation of the discharge capability of each sluice caisson. In the analysis, the experimental data of four different sluice models were used, which showed that the installation of rubble mound affects in different manner depending on each sluice caisson model. When each of the four sluice models were placed on the rubble mound respectively, the water discharge increased for one sluice caisson, whereas decreased for other three sluice caissons. Further detailed analysis is needed to quantitatively estimate the influence of installation of rubble mound on the water discharge capability of a sluice caisson.
URI
https://sciwatch.kiost.ac.kr/handle/2020.kiost/30024
Bibliographic Citation
한국신재생에너지학회 춘계학술대회, pp.266 - 269, 2008
Publisher
한국신재생에너지학회
Type
Conference
Language
Korean
Files in This Item:
There are no files associated with this item.

qrcode

Items in ScienceWatch@KIOST are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse