울돌목 시험조류발전소의 기초 시공 사례

Title
울돌목 시험조류발전소의 기초 시공 사례
Alternative Title
A Case Study on the Foundation Work of Uldolmok Tidal Current Power Plant
Author(s)
권오정; 오명학; 박진순; 이광수
KIOST Author(s)
Oh, Myoung Hak(오명학)Park, Jin Soon(박진순)
Alternative Author(s)
권오정; 오명학; 박진순; 이광수
Publication Year
2009-11-25
Abstract
Uldolmok tidal current power plant was constructed on May 2009 at Jindo Gun in Korea. However it had much trouble in installing structure due to the extremely fast tidal current velocity(max. 5.5m/sec) and the jacket type plant structure. Therefore in this paper, The characteristics of tidal current and sea bed topography at Uldolmok tidal current plant site are investigated, and the detailed foundation work process of the plant is described.
URI
https://sciwatch.kiost.ac.kr/handle/2020.kiost/29127
Bibliographic Citation
한국 신재생에너지학회 2009년도 추계학술대회논문집, pp.610 - 613, 2009
Publisher
한국 신재생에너지학회
Type
Conference
Language
Korean
Files in This Item:
There are no files associated with this item.

qrcode

Items in ScienceWatch@KIOST are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse