파랑을 고려한 항만 건설공사 작업일수 산정에 관한 연구 KCI

DC Field Value Language
dc.contributor.author 정신택 -
dc.contributor.author 백종대 -
dc.contributor.author 정원무 -
dc.contributor.author 최혁진 -
dc.date.accessioned 2020-04-16T08:25:12Z -
dc.date.available 2020-04-16T08:25:12Z -
dc.date.created 2020-02-10 -
dc.date.issued 2019-04 -
dc.identifier.issn 2288-7903 -
dc.identifier.uri https://sciwatch.kiost.ac.kr/handle/2020.kiost/724 -
dc.description.abstract Harbor construction projects are classified into various types according to project site. Most of the harbor projects, such as harbor structure, breakwater and dredging work, are located in areas that are affected by the wave conditions. Until now, the number of the working days for harbor construction have been estimated by applying the method considering the working days due to only weather conditions(Korean Society of Civil Engineers, 1969). However, this conventional estimation method is different from the actual field conditions, especially on harbor construction project, such as the fact that the effect of the wave is not considered so the estimated number of working days is too much. In this study, the numbers of working days obtained by the conventional method and the new method, estimated based on the long-term wave data derived from this study, were compared with the actual construction daily reports. As the result, the estimation of the annual workability rate is 70% from the conventional method and 45.5% from the new method considering the wave condition, almost similar to the 51.8% result of the actual construction daily reports analysis. From these results, it is necessary to consider the effect of the wave condition, which is the most important factor in the estimation of the number of working days for harbor construction project, especially for breakwaters. This new estimation method of the number of working days for harbor construction project considering wave condition is needed precise long-term wave data of the whole sea area in Korea and additional study is required in the future. -
dc.description.uri 2 -
dc.language Korean -
dc.publisher (사)한국연안방재학회 -
dc.title 파랑을 고려한 항만 건설공사 작업일수 산정에 관한 연구 -
dc.title.alternative A Study on the Estimation of the Number of Working Days for Harbor Construction Project Considering Wave Condition -
dc.type Article -
dc.citation.endPage 82 -
dc.citation.startPage 71 -
dc.citation.title 한국연안방재학회지 -
dc.citation.volume 6 -
dc.citation.number 2 -
dc.contributor.alternativeName 정원무 -
dc.identifier.bibliographicCitation 한국연안방재학회지, v.6, no.2, pp.71 - 82 -
dc.identifier.doi 10.20481/kscdp.2019.6.2.71 -
dc.identifier.kciid ART002463400 -
dc.description.journalClass 2 -
dc.description.isOpenAccess N -
dc.subject.keywordAuthor Harbor construction -
dc.subject.keywordAuthor Working days -
dc.subject.keywordAuthor Weather condition -
dc.subject.keywordAuthor Wave condition -
dc.subject.keywordAuthor Long-term wave data -
dc.description.journalRegisteredClass kci -
Appears in Collections:
Marine Industry Research Division > Maritime ICT & Mobility Research Department > 1. Journal Articles
Files in This Item:
There are no files associated with this item.

qrcode

Items in ScienceWatch@KIOST are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse