Lake Sihwa tidal power plant project SCIE SCOPUS

Cited 76 time in WEB OF SCIENCE Cited 107 time in Scopus
Title
Lake Sihwa tidal power plant project
Author(s)
Bae, Young Ho; Kim, Kyeong Ok; Choi, Byung Ho
KIOST Author(s)
Kim, Kyeong Ok(김경옥)
Alternative Author(s)
김경옥
Publication Year
2010-04
Abstract
A Tidal Power Plant (TPP) is being constructed in the middle section of the existing Lake Sihwa dike located near the southern Incheon Port in Korea. The project, which will be completed in 2010, is to harness the largest tidal energy in the Kyeonggi Bay in the eastern Yellow Sea. While noting the current progress in terms of plant construction, this paper outlines the overall project in the tidal regime and uses predictive local flow modeling. The results of two-dimensional finite element method simulations that predict the real-time tidal characteristics during the construction and after the completion of the tidal power plant are presented, including a method to estimate the electricity output from the plant in the future. (C) 2010 Elsevier Ltd. All rights reserved.
ISSN
0029-8018
URI
https://sciwatch.kiost.ac.kr/handle/2020.kiost/4119
DOI
10.1016/j.oceaneng.2010.01.015
Bibliographic Citation
OCEAN ENGINEERING, v.37, no.5-6, pp.454 - 463, 2010
Publisher
PERGAMON-ELSEVIER SCIENCE LTD
Keywords
Tidal power plant; Sihwa Lake; Tidal modeling
Type
Article
Language
English
Document Type
Article
Files in This Item:
There are no files associated with this item.

qrcode

Items in ScienceWatch@KIOST are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse