Systemic development status of GOCI-II Ground Segment(G2GS)

DC Field Value Language
dc.contributor.author 한희정 -
dc.contributor.author 허재무 -
dc.contributor.author 양현 -
dc.contributor.author 조성익 -
dc.contributor.author 곽성희 -
dc.contributor.author 이태경 -
dc.contributor.author 박영제 -
dc.date.accessioned 2020-07-15T15:33:21Z -
dc.date.available 2020-07-15T15:33:21Z -
dc.date.created 2020-02-11 -
dc.date.issued 2017-05-15 -
dc.identifier.uri https://sciwatch.kiost.ac.kr/handle/2020.kiost/23987 -
dc.description.abstract In 2019, the GOCI-II, second geostationary ocean color sensor of the Republic of Korea, will be launched and its ground segment will be operated regularly. According to GOCI-II specification which is higher than GOCI, we have to develop new ground segment (GS) systems to meet several requirements like timeliness, accuracy, availability, consistency. System development is composed of a. development of data processing algorithms/systems, b. development of ground-based operation systems, and c. development of GS infrastructure. Data processing algorithms are newly developed by applying several bands that have been added to the GOCI-II, and the existing GOCI algorithms will be reused after verification. G2GS systems are developed with six subsystems, data acquisition (DAS), data correction (DCS), data processing (ODPS), data management (DMS), operations and quality management (OQMS), precision correction (PCS). The GS infrastructure will be newly installed in KIOST complex in Busan. The system designed to satisfy the system requirements with the latest IT technologies like automation, parallel processing, optimization, high-performance hardware. The current detailed design has reached the end of the course, completing the interface, screen, component, class, and data diagram design. The system will be finalized in 2018, and tested until launch of GOCI-II. Also, separate data analysis software and data distribution system ground segment (GS) systems to meet several requirements like timeliness, accuracy, availability, consistency. System development is composed of a. development of data processing algorithms/systems, b. development of ground-based operation systems, and c. development of GS infrastructure. Data processing algorithms are newly developed by applying several bands that have been added to the GOCI-II, and the existing GOCI algorithms will be reused after verification. G2GS systems are developed with six subsystems, data acquisition (DAS), data correction (DCS), data processing (ODPS), data management (DMS), operations and quality management (OQMS), precision correction (PCS). The GS infrastructure will be newly installed in KIOST complex in Busan. The system designed to satisfy the system requirements with the latest IT technologies like automation, parallel processing, optimization, high-performance hardware. The current detailed design has reached the end of the course, completing the interface, screen, component, class, and data diagram design. The system will be finalized in 2018, and tested until launch of GOCI-II. Also, separate data analysis software and data distribution system -
dc.description.uri 1 -
dc.language English -
dc.publisher IOCS -
dc.relation.isPartOf 2017 IOCS -
dc.title Systemic development status of GOCI-II Ground Segment(G2GS) -
dc.type Conference -
dc.citation.endPage 88 -
dc.citation.startPage 88 -
dc.citation.title 2017 IOCS -
dc.contributor.alternativeName 한희정 -
dc.contributor.alternativeName 허재무 -
dc.contributor.alternativeName 양현 -
dc.contributor.alternativeName 조성익 -
dc.contributor.alternativeName 박영제 -
dc.identifier.bibliographicCitation 2017 IOCS, pp.88 -
dc.description.journalClass 1 -
Appears in Collections:
Marine Digital Resources Department > Korea Ocean Satellite Center > 2. Conference Papers
Files in This Item:
There are no files associated with this item.

qrcode

Items in ScienceWatch@KIOST are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse