석션버켓기초 공사중 발생한 문제에 대한 해결 및 사례연구

DC Field Value Language
dc.contributor.author 강현 -
dc.contributor.author 권오순 -
dc.contributor.author 오명학 -
dc.contributor.author 장인성 -
dc.contributor.author 곽대진 -
dc.contributor.author 손현구 -
dc.date.accessioned 2020-07-15T15:32:08Z -
dc.date.available 2020-07-15T15:32:08Z -
dc.date.created 2020-02-11 -
dc.date.issued 2017-06-27 -
dc.identifier.uri https://sciwatch.kiost.ac.kr/handle/2020.kiost/23926 -
dc.description.abstract The suction bucket foundation is installed on the seabed under combined self-weight and under-pressure. In this case study, four submersible monitoring structures for the active sensors were constructed on the ultra-soft seabed using suction bucket foundations. After construction, the excessive displacements of the column top due to the external excitation were measured. The cause analysis of the problem carried out and the reinforcement method to reduce the excessive displacement were applied. As the review results, the excessive displacements were developed for the connection rigidity problem between suction foundation and upper part column. Adopted reinforcing method was additional bettered stiffener mounting. Finally, the angular displacements at the same underwater excitation test after the reinforcement were reduced nearly designed value.n bucket foundations. After construction, the excessive displacements of the column top due to the external excitation were measured. The cause analysis of the problem carried out and the reinforcement method to reduce the excessive displacement were applied. As the review results, the excessive displacements were developed for the connection rigidity problem between suction foundation and upper part column. Adopted reinforcing method was additional bettered stiffener mounting. Finally, the angular displacements at the same underwater excitation test after the reinforcement were reduced nearly designed value. -
dc.description.uri 1 -
dc.language English -
dc.publisher ISOPE -
dc.relation.isPartOf ISOPE(International Society of Offshore and Polar Engineers) -
dc.title 석션버켓기초 공사중 발생한 문제에 대한 해결 및 사례연구 -
dc.title.alternative Case Study on the Process of Problem Solving in Suction Bucket Foundation Construction -
dc.type Conference -
dc.citation.conferencePlace US -
dc.citation.endPage 479 -
dc.citation.startPage 475 -
dc.citation.title ISOPE(International Society of Offshore and Polar Engineers) -
dc.contributor.alternativeName 강현 -
dc.contributor.alternativeName 권오순 -
dc.contributor.alternativeName 오명학 -
dc.contributor.alternativeName 장인성 -
dc.identifier.bibliographicCitation ISOPE(International Society of Offshore and Polar Engineers), pp.475 - 479 -
dc.description.journalClass 1 -
Appears in Collections:
Marine Industry Research Division > Maritime ICT & Mobility Research Department > 2. Conference Papers
Files in This Item:
There are no files associated with this item.

qrcode

Items in ScienceWatch@KIOST are protected by copyright, with all rights reserved, unless otherwise indicated.

Browse